Flemingsburg Bypass Water and Sewer Line Project

HMB was selected by the City of Flemingsburg  for the Flemingsburg Bypass Water and Sewer Line project.  HMB will provide planning, design, construction, and other required engineering services for the design and construction of this project.  The project consists of approximately 14,000 feet of 8-inch water line to serve future development on the new bypass and approximately 1,000 feet of 8-inch gravity sewer and 17,000 feet of 6-inch and 4-inch sewer force main.  HMB has been working in the Fleming County area for the past 25 years and is excited to continue to on this project.

Leave a Reply

Your email address will not be published. Required fields are marked *